Kitchen advice for Dudley homes

Getting ready for your kitchen fitter: a checklist

The week before a kitchen goes in decides how smoothly it runs. Work through this list, and the first day starts with fitting and not with moving boxes.

Two weeks before

Check the delivery date against the fitter's start date. Count the boxes when they arrive and look for damage. Keep them dry.

  1. Agree the start date in writing
  2. Check the delivery list
  3. Decide who is taking the old kitchen away
  4. Pick the handles and finish the tap choice

The day before

Empty every cupboard. Take things off the walls and the worktop. Keep a clear route from the front door through to the kitchen. If you have a pet, think where it will stay.

Living without a kitchen

You will not have a sink for a few days. Plan for it.

  • A kettle and a microwave set up in another room
  • Paper plates and plastic cutlery
  • A washing-up bowl and a jug for water
  • Takeaway nights written into the diary

Ask the fitter how long the water will be off, so you can plan around it.

On the first day

Walk through the plan with the fitter. Point out where the sockets, pipes and radiators sit. Agree where they can leave tools and where the rubbish goes. Agree what happens if something unexpected turns up behind the old units.

At the end

Before you pay the last instalment, open every door and drawer. Run the taps. Check the worktop joints. Mention snags then, while the fitter is still there.

Deliveries and storage

Ask the supplier for a date and a time slot, and be home. Keep boxes flat and dry, away from outside walls. Check that the doors, handles and worktop are in the delivery before the fitter arrives, since a missing part can stop work for days.

Dust, noise and neighbours

Stripping out a kitchen is noisy and dusty. Close the doors to the other rooms and put a sheet across the doorway. If you live in a flat or a terrace, tell the neighbours when the loudest days will be.

Pets and young children

A kitchen in the middle of a fit has sharp edges, open pipes and dust. Keep children and pets away from the room, and keep the door shut while the fitter is not there.

Agreeing the small things

Agree where the fitter parks, which toilet they use and when they finish for the day. Agree who turns the water off and on. These are small matters, but they are the usual cause of friction in the first week.

Keeping a record

Take photographs of the kitchen before work starts, and again at the end of each day. If a question arises about a wall or a pipe later, you have a record of what was there.

If something goes wrong

A delivery can arrive damaged and a wall can hide a problem. Ring the fitter at once, take photographs and agree what happens next in writing. Raising a problem on the day is far easier than raising it a month later.

Ready to book a fitter?

Having a fitter lined up early gives you time to prepare the room. A rushed start often means a rushed finish.

Give the job and your area of Dudley when you ask. Asking is free.

Get a free kitchen quote

Takes about a minute. No email needed.

By sending this form you agree to your details being shared with a local kitchen fitter so they can contact you. See our privacy notice.

Get a free quote